Home Where we work United Arab EmiratesKarachi → United Arab Emirates · 8h shared

Web development
for the
UAE

The UAE is the closest big market to us in every sense that matters — one hour of clock difference, the same working week, and a buyer who expects a site to load fast on a phone in a mall carpark. Most of our overseas work starts here.

/01

When we're both awake.

Computed

Worked out from the timezone database when this page was built, against a 9–6 working day at each end — not typed in, so it stays right when the clocks change. We're in Karachi, Monday to Friday.

Dubai, Abu Dhabi & Sharjah

8hours together, every working day

Your side
9am–5pm
Our side
10am–6pm
Your working week
Monday to Friday, with Friday a short day — the UAE moved off the Sunday–Thursday week at the start of 2022, so our weeks now line up almost exactly.
We quote in
AED, against a fixed scope.
Payment
Ask us — we'll tell you exactly what we can accept from the UAE before you commit to anything.
Where we are
Karachi, Pakistan. No office in the UAE and we won't pretend otherwise.
/02

What's different here.

United Arab Emirates

Bilingual, and properly bilingual

A great many UAE sites carry an Arabic toggle that was translated once and then left to rot while the English side moved on. We build the two as one site — shared content model, mirrored layout, right-to-left handled in the CSS rather than bolted on, and Arabic typography that is actually set rather than defaulted. If you only need English today, the build still leaves the door open.

Built for how the UAE actually browses

Phone-first to a degree that surprises people who plan for desktop, and a lot of that traffic arrives from Instagram and WhatsApp rather than from search. That changes what the top of the page has to do and it changes which preview image matters, so we treat the share card as part of the build rather than an afterthought.

Close enough for real-time

One hour apart means no async workaround: we can be in the same call at the same point in both our afternoons, screen-share a staging build and change it while you watch. It is the reason UAE projects tend to move faster than the rest of our overseas work.

Building for
the UAE?

Send a line about the project — scope, deadline, budget range if you have one. Tell us which city you're in and we'll reply inside the window at the top of this page.